$1,116,500.00. Design/ Bid/ Build, Lump sum. Stantec Engineering. Complete overhaul and replacement of existing water treatment facilities including well pump, filter vessels, & distribution pumps. Due to tight sequencing...
$2,000,000. Design/ Bid/ Build, Lump Sum. Brown and Caldwell Engineering. Coordinate and Install 100,000 gallon per day Package Primary and Secondary Treatment system. All water was re-used for golf course irrigation...
E.P.C., Lump Sum. $8,200,000. Eco-Logic Engineering and Siemens Water Technology. Aggressive design, procurement and construction requirements in order for facility to be operational before $400,000,000 new expansion...
Design-Build, Cost Plus. $3,500,000. Brown and Caldwell Engineering and Stantec Engineering. Existing Headworks discharge manifold piping failed, causing City to utilize temporary by pass pumping costing thousands...