$29,991,581. CMAR, Lump Sump. Carollo Engineering. New Biological Nutrient Removal System and New Secondary Clarifier with upgrades to existing facility components to comply with State discharge permit requirements....
CMAR, Cost Plus GMP. $12,688,166. CH2MHill Engineering. Coming in under budget by 8% is proof of the benefits from a collaborative approach to problem solving. On the shores of Lake Tahoe with a very small laydown area....
Design/ Bid/ Build, Lump Sum. $2,390,000. HDR Engineering. Constructed a new standby power Generator Building for the effluent discharge pumps which lift the treated waste water from Incline Village’s waste water plant...
Design/ Bid/ Build, Lump Sum. $4,441,500. Carollo Engineering. New digester gas collection piping, gas blowers, biological hydrogen sulfide removal tower, gas flare and process control equipment in order to clean methane gas...
$40,000,000. Design/ Bid/ Build, Lump Sum. CDM Engineers. Largest Public Works project for Lyon County and the City of Fernley. EPA Unfunded mandates on lowering detection levels of Arsenic in the drinking water forced...
$1,116,500.00. Design/ Bid/ Build, Lump sum. Stantec Engineering. Complete overhaul and replacement of existing water treatment facilities including well pump, filter vessels, & distribution pumps. Due to tight sequencing...
$2,000,000. Design/ Bid/ Build, Lump Sum. Brown and Caldwell Engineering. Coordinate and Install 100,000 gallon per day Package Primary and Secondary Treatment system. All water was re-used for golf course irrigation...
E.P.C., Lump Sum. $8,200,000. Eco-Logic Engineering and Siemens Water Technology. Aggressive design, procurement and construction requirements in order for facility to be operational before $400,000,000 new expansion...
Design-Build, Cost Plus. $3,500,000. Brown and Caldwell Engineering and Stantec Engineering. Existing Headworks discharge manifold piping failed, causing City to utilize temporary by pass pumping costing thousands...