Preconstruction
We work beside both owner and designer during constructability review sessions, making appropriate adjustments in design to accommodate preferred means and methods of construction, utilize the most efficient and sustainable materials and incorporate industry best practices.
Resulting in lower and more realistic project costs and schedule durations. Our longstanding relationships with top tier industry subcontractors and suppliers provides net savings that are passed on to the owner.
Contract delivery methods are shifting in the industry from the typical design-bid-build, to methods such as CMAR given it allows owners to confirm contractors qualifications prior to bidding, reducing risk and change orders by bringing the contractor in early as a team member for input and taking ownership in the project.
CMAA report of 623 industry wide projects concludes a cost and time savings of 3% on projects utilizing certified construction managers.