Design/ Bid/ Build, Lump Sum. $2,390,000. HDR Engineering. Constructed a new standby power Generator Building for the effluent discharge pumps which lift the treated waste water from Incline Village’s waste water plant over Spooner summit and down to the Carson Valley. Extremely tight working area along two-lane portion of highway 28. Coordinated with seven different regulatory agencies.