Over 40 years of experience in self-performing Water Treatment Plant Construction has provided the essential understanding needed to deliver quality projects from inception to completion.

Company

Who We Are

Safety

News

Associations and Community

services

Our attitude at KG Walters has always been to provide a service for the owner, viewing our relationship with owners and engineers as team members, using a partnering approach to problem solving. Regardless of the contract delivery method, our intent is always to provide the best product for the best value.

Preconstruction

Design Build

General Engineering

Emergency Repair

Technology

Projects

Each job has a personality of its own, creating unique challenges during construction, ultimately producing long term relationships between KG Walters and our clients.

Carson City WRRF Phase 1A

$29,991,581. CMAR, Lump Sump. Carollo Engineering. New Biological Nutrient Removal System and New Secondary Clarifier with upgrades to existing facility components to comply with State discharge permit requirements….

Kingsbury GID Ozone & UV Treatment Plant

CMAR, Cost Plus GMP. $12,688,166. CH2MHill Engineering. Coming in under budget by 8% is proof of the benefits from a collaborative approach to problem solving. On the shores of Lake Tahoe with a very small laydown area….

Spooner Summit Pump Station Improvement Project

Design/ Bid/ Build, Lump Sum. $2,390,000. HDR Engineering. Constructed a new standby power Generator Building for the effluent discharge pumps which lift the treated waste water from Incline Village’s waste water plant…

Truckee Meadows Water Reclamation Gas Conditioning Project

Design/ Bid/ Build, Lump Sum. $4,441,500. Carollo Engineering. New digester gas collection piping, gas blowers, biological hydrogen sulfide removal tower, gas flare and process control equipment in order to clean methane gas…

Fernley Arsenic Removal Water Treatment Facility

$40,000,000. Design/ Bid/ Build, Lump Sum. CDM Engineers. Largest Public Works project for Lyon County and the City of Fernley. EPA Unfunded mandates on lowering detection levels of Arsenic in the drinking water forced…

Truckee Canyon Water System Expansion

$1,116,500.00. Design/ Bid/ Build, Lump sum. Stantec Engineering. Complete overhaul and replacement of existing water treatment facilities including well pump, filter vessels, & distribution pumps. Due to tight sequencing…

Churchill County Package Water Treatment Plant

$2,000,000. Design/ Bid/ Build, Lump Sum. Brown and Caldwell Engineering. Coordinate and Install 100,000 gallon per day Package Primary and Secondary Treatment system. All water was re-used for golf course irrigation…

Office: (775) 677.7220
Fax: (775) 677.7889
Email: info@kgwalters.com

9945 N. Virginia Street
Reno, NV 89506

License NV 0017383A & 0017383A
license OR 56742

Office: (707) 527.9968
Fax: (707) 527.0244
Email: info@kgwalters.com

195 Concourse Blvd., Suite A
Santa Rosa, CA 95403

License CA 301314 AB
License ID 028043