Carson City WRRF Phase 1A

Carson City WRRF Phase 1A

$29,991,581. CMAR, Lump Sump. Carollo Engineering. New Biological Nutrient Removal System and New Secondary Clarifier with upgrades to existing facility components to comply with State discharge permit requirements. Completed 9 month early. Went through 3 major scope...
Kingsbury GID Ozone & UV Treatment Plant

Kingsbury GID Ozone & UV Treatment Plant

CMAR, Cost Plus GMP. $12,688,166. CH2MHill Engineering. Coming in under budget by 8% is proof of the benefits from a collaborative approach to problem solving. On the shores of Lake Tahoe with a very small laydown area. District was faced with an aggressive schedule...
Spooner Summit Pump Station Improvement Project

Spooner Summit Pump Station Improvement Project

Design/ Bid/ Build, Lump Sum. $2,390,000. HDR Engineering. Constructed a new standby power Generator Building for the effluent discharge pumps which lift the treated waste water from Incline Village’s waste water plant over Spooner summit and down to the Carson...
Truckee Meadows Water Reclamation Gas Conditioning Project

Truckee Meadows Water Reclamation Gas Conditioning Project

Design/ Bid/ Build, Lump Sum. $4,441,500. Carollo Engineering. New digester gas collection piping, gas blowers, biological hydrogen sulfide removal tower, gas flare and process control equipment in order to clean methane gas to EPA acceptable total sulfur emission...
Fernley Arsenic Removal Water Treatment Facility

Fernley Arsenic Removal Water Treatment Facility

$40,000,000. Design/ Bid/ Build, Lump Sum. CDM Engineers. Largest Public Works project for Lyon County and the City of Fernley. EPA Unfunded mandates on lowering detection levels of Arsenic in the drinking water forced City to hike rates up to complete this publicly...
Truckee Canyon Water System Expansion

Truckee Canyon Water System Expansion

$1,116,500.00. Design/ Bid/ Build, Lump sum. Stantec Engineering. Complete overhaul and replacement of existing water treatment facilities including well pump, filter vessels, & distribution pumps. Due to tight sequencing, KG Walters had to coordinate activities...
Churchill County Package Water Treatment Plant

Churchill County Package Water Treatment Plant

$2,000,000. Design/ Bid/ Build, Lump Sum. Brown and Caldwell Engineering. Coordinate and Install 100,000 gallon per day Package Primary and Secondary Treatment system. All water was re-used for golf course...

Tracy Clark Power Plant Cooling Water Treatment Facility

E.P.C., Lump Sum. $8,200,000. Eco-Logic Engineering and Siemens Water Technology. Aggressive design, procurement and construction requirements in order for facility to be operational before $400,000,000 new expansion of power plant closed loop cooling system came on...