(775) 677.7220 | (707) 527.9968 INFO@KGWALTERS.COM

Design-Build, Cost Plus. $3,500,000. Brown and Caldwell Engineering and Stantec Engineering. Existing Headworks discharge manifold piping failed, causing City to utilize temporary by pass pumping costing thousands of dollars per day. Scheduling, coordination, procurement and design all required huge levels of dedication from the project team to get the plant on line as quickly and safely as possible.